Skip to content

SSC LABS – Beam Time Schedule

Overview | K=600 Spectrometer | AFRODITE | ALBA | Electron Spectrometer | Fast Timing Array | Tape Station | H-Line | Infrastructure | Beam Time Schedule | Staff |

The calendar above shows the scheduled activities at iThemba LABS. List of experimental areas with colour code are:

A-Line (Subatomic Physics)
B-Line (Radiation Biophysics)
D-Line (Neutron Physics)
F-Line (Gamma-ray spectroscopy)
G-Line (Subatomic Physics)
S-Line (K600 spectrometer)
RERAME (Sample Irradiation)
Isotope Production
Maintenance

To enable/disable a specific activity, click on the button in the upper-right corner of the calendar window then check or uncheck the required calendar.

Please send any comments or queries to Pete Jones or the local liaison officer for the experiment.

Target request form